| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS ISO/IEC 17050-2: 2004 CONFORMITY ASSESSMENT — SUPPLIER’S
DECLARATION OF CONFORMITY —
PART 2: SUPPORTING DOCUMENTATION | 3,000.00 | 7 | 21,000.00 | |
| 2 | Rwanda Standards | RS 181: 2025 SOLID WASTE — HANDLING, COLLECTION, TRANSPORTATION AND DISPOSAL — CODE OF PRACTICE | 18,000.00 | 14 | 252,000.00 | |
| 3 | Rwanda Standards | RS ARS 869: 2023 DRY WHOLE PEAS — SPECIFICATION | 7,500.00 | 13 | 97,500.00 | |
| 4 | Rwanda Standards | RS ISO 8256: 2023 PLASTICS — DETERMINATION OF TENSILE-IMPACT
STRENGTH | 24,000.00 | 17 | 408,000.00 | |
| 5 | Rwanda Standards | RS ISO 4250-1: 2023 EARTH-MOVER TYRES AND RIMS —
PART 1: TYRE DESIGNATION AND DIMENSIONS | 36,000.00 | 12 | 432,000.00 | |
| 6 | Rwanda Standards | RS ISO 11623: 2023 GAS CYLINDERS — COMPOSITE CYLINDERS AND
TUBES — PERIODIC INSPECTION AND TESTING | 58,500.00 | 13 | 760,500.00 | |
| 7 | Rwanda Standards | RS 604-1: 2025 ORGANO-MINERAL FERTILIZER — SPECIFICATION —
PART 1: SOLID | 10,500.00 | 14 | 147,000.00 | |
| 8 | Rwanda Standards | RS ISO 5775-1: 2023 BICYCLE TYRES AND RIMS —
PART 1: TYRE DESIGNATIONS AND DIMENSIONS | 28,500.00 | 12 | 342,000.00 | |
| Total | RWF 2,460,000.00 | |