| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS EAS 1207: 2024 ASPHALT PAVING MIX DESIGN — CODE OF
PRACTICE | 100,000.00 | 35 | 3,500,000.00 | |
| 2 | Rwanda Standards | RS ISO 4427-5: 2019 PLASTICS PIPING SYSTEMS — POLYETHYLENE (PE) PIPES AND FITTINGS FOR WATER SUPPLY — PART 5: FITNESS FOR PURPOSE OF THE SYSTEM | 13,500.00 | 75 | 1,012,500.00 | |
| 3 | Rwanda Standards | RS EAS 902: 2018 BULK LIQUEFIED PETROLEUM GAS (LPG) ROAD TANKERS — ASSEMBLING — REQUIREMENTS | 45,000.00 | 94 | 4,230,000.00 | |
| 4 | Rwanda Standards | RS ISO 2919: 2012 RADIOLOGICAL PROTECTION — SEALED RADIOACTIVE SOURCES — GENERAL REQUIREMENTS AND CLASSIFICATION | 28,500.00 | 53 | 1,510,500.00 | |
| 5 | Rwanda Standards | RS EAS 811-1: 2014 CODE OF PRACTICE FOR SAFETY OF ELECTRICAL INSTALLATIONS — PART 1: GENERAL | 24,000.00 | 85 | 2,040,000.00 | |
| 6 | Rwanda Standards | RS ISO 4593: 1993 PLASTICS: FILM AND SHEETING — DETERMINATION OF THICKNESS BY MECHANICAL SCANNING | 3,000.00 | 83 | 249,000.00 | |
| 7 | Rwanda Standards | RS ISO 4269: 2001 PETROLEUM AND LIQUID PETROLEUM PRODUCTS — TANK CALIBRATION BY LIQUID MEASUREMENT — INCREMENTAL METHOD USING VOLUMETRIC METERS | 39,000.00 | 72 | 2,808,000.00 | |
| Total | RWF 15,350,000.00 | |