| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS ISO 21502: 2020 PROJECT, PROGRAMME AND PORTFOLIO
MANAGEMENT — GUIDANCE ON PROJECT
MANAGEMENT | 78,000.00 | 21 | 1,638,000.00 | |
| 2 | Rwanda Standards | RS ISO 9606-3: 1999 APPROVAL TESTING OF WELDERS — FUSION
WELDING —
PART 3: COPPER AND COPPER ALLOYS | 34,500.00 | 21 | 724,500.00 | |
| 3 | Rwanda Standards | RS 144: 2021 CONCRETE BUILDING BLOCKS AND BRICKS — SPECIFICATION | 19,500.00 | 5 | 97,500.00 | |
| 4 | Rwanda Standards | RS 186-2: 2024 FIRE SAFETY FOR BUILDINGS — CODE OF
PRACTICE —
PART 2: DETAILS OF CONSTRUCTION | 31,500.00 | 22 | 693,000.00 | |
| 5 | Rwanda Standards | RS ISO 17269: 2000 PASSANGER CAR TYRES — METHODS FOR MEASURING ROLLING CIRCUMFERENCE — LOADED NEW TYRES | 12,000.00 | 22 | 264,000.00 | |
| 6 | Rwanda Standards | RS ISO 14968: 1999 PAPER AND BOARD — CUT-SIZE OFFICE PAPER — MEASUREMENT OF CURL IN A PACK OF SHEETS | 12,000.00 | 11 | 132,000.00 | |
| 7 | Rwanda Standards | RS ISO 2480: 1972 SODIUM CHLORIDE FOR INDUSTRIAL USE — DETERMINATION OF SULPHATE CONTENT — BARIUM SULPHATE GRAVIMETRIC METHOD | 3,000.00 | 5 | 15,000.00 | |
| Total | RWF 3,564,000.00 | |