RS EAS 389-2: 2005 SOLAR PHOTOVOLTAIC POWER SYSTEMS — DESIGN, INSTALLATION OPERATION MONITORING AND MAINTENANCE — CODE OF PRACTICE — PART 2: INSTALLATION OF SOLAR PV POWER SYSTEMS
126,000.00
46
5,796,000.00
2
Rwanda Standards
RS ISO 7240-1: 2014 FIRE DETECTION AND ALARM SYSTEMS —
PART 1: GENERAL AND DEFINITIONS
24,000.00
31
744,000.00
3
Rwanda Standards
RS EAS 366: 2005 CHARACTERISTICS PARAMETERS OF STAND — ALONE PHOTOVOLTAIC(PV)SYSTEMS
13,500.00
46
621,000.00
4
Rwanda Standards
RS EAS 365: 2005 THIN-FILM TERRESTRIAL PHOTOVOLTAIC (PV) MODULES — DESIGN QUALIFICATION AND TYPE APPROVAL