| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS ISO 15874-3:2013/Amd 2:2021 PLASTICS PIPING SYSTEMS FOR HOT AND COLD
WATER INSTALLATIONS — POLYPROPYLENE (PP) —
PART 3: FITTINGS | 34,500.00 | 56 | 1,932,000.00 | |
| 2 | Rwanda Standards | RS ISO 8992: 2005 FASTENERS — GENERAL REQUIREMENTS FOR BOLTS, SCREWS, STUDS AND NUTS | 6,000.00 | 20 | 120,000.00 | |
| 3 | Rwanda Standards | RS ISO 7240-17: 2020 FIRE DETECTION AND ALARM SYSTEMS —
PART 17: TRANSMISSION PATH ISOLATORS | 45,000.00 | 55 | 2,475,000.00 | |
| 4 | Rwanda Standards | RS ISO 7240-24: 2016 FIRE DETECTION AND ALARM SYSTEMS —
PART 24: FIRE ALARM LOUDSPEAKERS | 58,500.00 | 55 | 3,217,500.00 | |
| 5 | Rwanda Standards | RS ISO 9117-4: 2012 PAINTS AND VARNISHES — DRYING TESTS —
PART 4: TEST USING A MECHANICAL RECORDER | 7,500.00 | 55 | 412,500.00 | |
| 6 | Rwanda Standards | RS ISO 10555-6:2015/Amd 1:2019 INTRAVASCULAR CATHETERS — STERILE AND SINGLE-USE CATHETERS — PART 6: SUBCUTANEOUS IMPLANTED PORTS | 25,500.00 | 55 | 1,402,500.00 | |
| 7 | Rwanda Standards | RS ISO 15874-2:2013/Amd 1:2018 PLASTICS PIPING SYSTEMS FOR HOT AND COLD
WATER INSTALLATIONS — POLYPROPYLENE (PP) —
PART 2: PIPES | 33,000.00 | 55 | 1,815,000.00 | |
| Total | RWF 11,374,500.00 | |