| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS 393-8: 2018 SPATIAL APPLICATION MOSQUITO REPELLENTS — SPECIFICATION — PART 8: LIQUID DETERGENT | 24,000.00 | 27 | 648,000.00 | |
| 2 | Rwanda Standards | RS EAS 1182: 2024 AGRICULTURAL MACHINERY — DISC AND MOULDBOARD PLOUGHS — TEST
METHODS | 30,000.00 | 47 | 1,410,000.00 | |
| 3 | Rwanda Standards | RS ISO 14030-2: 2021 ENVIRONMENTAL PERFORMANCE EVALUATION —
GREEN DEBT INSTRUMENTS —
PART 2: PROCESS FOR GREEN LOANS | 22,500.00 | 29 | 652,500.00 | |
| 4 | Rwanda Standards | RS EAS 1093: 2023 COMPOUNDED HORSE FEED — SPECIFICATION | 12,000.00 | 14 | 168,000.00 | |
| 5 | Rwanda Standards | RS EAS 1076: 2022 CINNAMON (CINNAMOMUM ZEYLANICUM BLUME) — SPECIFICATION | 7,500.00 | 22 | 165,000.00 | |
| 6 | Rwanda Standards | RS 529: 2023 NATURAL STONE TEST METHODS —
DETERMINATION OF THE BREAKING LOAD AT
DOWEL HOLE | 21,000.00 | 22 | 462,000.00 | |
| 7 | Rwanda Standards | RS EAS 1080: 2023 PLASTIC BUCKET — SPECIFICATION | 15,000.00 | 14 | 210,000.00 | |
| 8 | Rwanda Standards | RS ASTM D1583-01 TEST METHODS FOR HYDROGEN ION CONCENTRATION OF DRY ADHESIVE FILMS | 3,000.00 | 14 | 42,000.00 | |
| 9 | Rwanda Standards | RS ISO 23045: 2008 BUILDING ENVIRONMENT DESIGN — GUIDELINES
TO ASSESS ENERGY EFFICIENCY OF NEW
BUILDINGS | 30,000.00 | 32 | 960,000.00 | |
| Total | RWF 4,717,500.00 | |