| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS ISO 186: 2002 PAPER AND BOARD — SAMPLING TO DETERMINE AVERAGE QUALITY | 13,500.00 | 56 | 756,000.00 | |
| 2 | Rwanda Standards | RS 595-5: 2025 DELTAMETHRIN PESTICIDES — SPECIFICATION —
PART 5: ULTRA LOW VOLUME LIQUID (ULV) | 10,500.00 | 51 | 535,500.00 | |
| 3 | Rwanda Standards | RS EAS 781: 2024 BISCUITS — SPECIFICATION | 15,000.00 | 36 | 540,000.00 | |
| 4 | Rwanda Standards | RS EAS 925: 2018 INSPECTION AND TESTING OF LIQUEFIED
PETROLEUM GAS (LPG) ROAD TANKERS | 15,000.00 | 121 | 1,815,000.00 | |
| 5 | Rwanda Standards | RS ISO 4250-3: 2020 EARTH-MOVER TYRES AND RIMS — PART 3: RIMS | 19,500.00 | 124 | 2,418,000.00 | |
| 6 | Rwanda Standards | RS EAS 854: 2024 THINNER FOR NITROCELLULOSE RESIN-BASED PAINTS AND LACQUERS — SPECIFICATION | 7,500.00 | 32 | 240,000.00 | |
| 7 | Rwanda Standards | RS ISO 1575:1987 TEA — DETERMINATION OF TOTAL ASH | 3,000.00 | 61 | 183,000.00 | |
| 8 | Rwanda Standards | RS ISO 5423: 1992 MOULDED PLASTICS FOOTWEAR — LINED OR
UNLINED POLYURETHANE BOOTS FOR GENERAL
INDUSTRIAL USE — SPECIFICATION | 22,500.00 | 1 | 22,500.00 | |
| Total | RWF 6,510,000.00 | |