| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS ISO 21502: 2020 PROJECT, PROGRAMME AND PORTFOLIO
MANAGEMENT — GUIDANCE ON PROJECT
MANAGEMENT | 78,000.00 | 1 | 78,000.00 | |
| 2 | Rwanda Standards | RS ISO 4427-2:2019/Amd 1:2023 PLASTICS PIPING SYSTEMS FOR WATER SUPPLY,
AND FOR DRAINAGE AND SEWERAGE UNDER
PRESSURE — POLYETHYLENE (PE)
PART 2: PIPES | 31,500.00 | 4 | 126,000.00 | |
| 3 | Rwanda Standards | RS ISO 10364: 2015 STRUCTURAL ADHESIVES — DETERMINATION OF THE POT LIFE (WORKING LIFE) OF MULTI-COMPONENT ADHESIVES | 12,000.00 | 1 | 12,000.00 | |
| 4 | Rwanda Standards | RS ISO 148-1: 2016 METALLIC MATERIALS — CHARPY PENDULUM IMPACT TEST — PART 1: TEST METHOD | 43,500.00 | 56 | 2,436,000.00 | |
| 5 | Rwanda Standards | RS ASTM D187-18 STANDARD TEST METHOD FOR BURNING QUALITY OF KEROSINE | 7,500.00 | 27 | 202,500.00 | |
| 6 | Rwanda Standards | RS ARS 1106: 2023 TILAPIA PRODUCTION AQUACULTURE FARMS —
GOOD AQUACULTURE PRACTICES | 49,500.00 | 2 | 99,000.00 | |
| Total | RWF 2,953,500.00 | |