RS ISO 1452-3: 2009 PLASTICS PIPING SYSTEMS FOR WATER SUPPLY AND FOR BURIED AND ABOVE-GROUND DRAINAGE AND SEWERAGE UNDER PRESSURE — UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) — PART 3: FITTINGS
55,500.00
44
2,442,000.00
2
Rwanda Standards
RS 435: 2020 TIMBER IN JOINERY — GENERAL REQUIREMENTS
18,000.00
73
1,314,000.00
3
Rwanda Standards
RS ISO 21994: 2022 PASSENGER CARS — STOPPING DISTANCE AT
STRAIGHT-LINE BRAKING WITH ABS — OPEN-LOOP
TEST METHOD