| | ITEM | EACH | QTY | SUB-TOTAL | |
| 1 | Rwanda Standards | RS ISO 2719: 2016. Amd 1: 2021 DETERMINATION OF FLASH POINT ? PENSKY-MATERNS CLOSED UP METHOD | 33,000.00 | 71 | 2,343,000.00 | |
| 2 | Rwanda Standards | RS ISO 2566-1: 2021 STEEL — CONVERSION OF ELONGATION VALUES —
PART 1: CARBON AND LOW-ALLOY STEELS | 49,500.00 | 23 | 1,138,500.00 | |
| 3 | Rwanda Standards | RS ISO 8773: 2006 PLASTICS PIPING SYSTEMS FOR NON-PRESSURE
UNDERGROUND DRAINAGE AND SEWERAGE —
POLYPROPYLENE (PP) | 33,000.00 | 29 | 957,000.00 | |
| 4 | Rwanda Standards | RS ISO 7326: 2016 RUBBER AND PLASTICS HOSES — ASSESSMENT OF OZONE RESISTANCE UNDER STATIC CONDITIONS | 12,000.00 | 32 | 384,000.00 | |
| 5 | Rwanda Standards | RS ISO 14400: 2021 ROAD VEHICLES — WHEELS AND RIMS — USE,
GENERAL MAINTENANCE AND SAFETY
REQUIREMENTS AND OUT-OF-SERVICE CONDITIONS | 27,000.00 | 23 | 621,000.00 | |
| 6 | Rwanda Standards | RS ISO 20695:2020 ENTERAL FEEDING SYSTEMS — DESIGN AND TESTING | 64,500.00 | 60 | 3,870,000.00 | |
| 7 | Rwanda Standards | RS ISO 16121-2: 2011 ROAD VEHICLES — ERGONOMIC REQUIREMENTS FOR THE DRIVERS WORKPLACE IN LINE-SERVICE BUSES — PART 2: VISIBILITY | 9,000.00 | 26 | 234,000.00 | |
| 8 | Rwanda Standards | RS ISO 10993-1: 2018 BIOLOGICAL EVALUATION OF MEDICAL DEVICES — PART 1: EVALUATION AND TESTING WITHIN A RISK MANAGEMENT PROCESS | 61,500.00 | 56 | 3,444,000.00 | |
| Total | RWF 12,991,500.00 | |